- Full engineering, procurement, and construction package from FEL 1 through start-up
- Scope included five ship/barge loading docks
- Detailed design and construction of interconnections for three Enerflex skid units with dock loading arms
- All piping produced was 100% fabricated and tested at H+M’s on-site fabrication shop