There are many variations of project contract types, but for smaller projects, the most common are Time and Materials (T&M) and Separated Fixed-Price.
Common process engineering deliverables include P&IDs, PFDs, H&MBs, equipment data sheets, PSV studies, process simulations, and hydraulic studies.
A project P&ID is a schematic drawing that depicts the configuration of equipment, piping, valving, and instruments used to control the process.
A capital project Scope of Work highlights project objectives, features, requirements, and outcomes. This includes Scope of Facility and Scope of Services.
Stage gate in project management is a controlling mechanism used by many owner companies to determine if the project meets investment criteria.
Under an EPC contract, the contractor works under a single contract with a project owner, providing all design, procurement, and construction services.
Electrical FEED deliverables include single-line diagrams, instrumentation indexes, block diagrams, area classification plans, and load lists.
This comprehensive detailed design and engineering deliverable list covers common deliverables in a typical multidisciplinary capital project.
Piping FEED deliverables include plot plans, equipment arrangement plans, piping plans, line lists, tie-in lists, and tagged equipment lists, among others.
While capital project deliverables in construction can vary, there are several deliverables you are likely to come across. Here is a comprehensive list.
Front-end loading (FEL) deliverables can be categorized by phase (FEL 1, 2, and 3) and discipline. Here’s a comprehensive list of common FEL deliverables.
Common reasons why construction projects fail include gaps in communication and alignment, late or insufficient planning, change orders, and scope creep.
Learn about the components and steps involved in the capital project closeout report and how an EPC contractor can help validate the process.
While front-end engineering design deliverables can vary depending on client requirements, the process and resulting deliverables are fairly standardized.